plastic chairs system
WHAT TAKES THE MOST TIME DURING POST-TENSION ASSEMBLY?
PLACING THE PT SUPPORTS WITH TOP REBAR!
hOW COULD WE FIX IT?
WORKING WITH INNOVATIVE PRODUCTS!
ASSEMBLY TIME UP TO 50% FASTER
NO NEED TO ADD THE TOP REBAR
REDUCES 80% OF TIES
REDUCTION IN SPECIALIZED LABOR AND EASIER INSPECTION
GUARANTEE OF THE CABLE POSITION ACCORDING TO THE ENGINEER’S DESIGN
0% BROKEN SUPPORTS DURING CONCRETE PLACEMENT
ELIMINATES THE RISK OF FUTURE CONCRETE PATHOLOGIES
PRODUCT TESTED AND FOLLOWS THE STANDARD
COLOR CODED DESIGNS - SUPPORT PLANS
We provide the support plans with the specific color detail to assembly the product.